This hospital roof waterproofing project supported a new oncology facility. A brand new, state of the art Oncology Unit had been proposed for Southampton General Hospital, to become a flagship facility for the area. Designed to house 27 dedicated beds, cutting edge treatment rooms and medical equipment, the new Oncology Unit would provide life saving treatment for cancer patients and essential support services to the locality.

With works originally scheduled to commence during the COVID-19 pandemic, the NHS Trust Estates Team worked closely with Garland UK and all contractors to speed up the construction as safely as possible, to ensure the vital facilities were available at the earliest convenience.

Rooftop terrace with gravel, paving stones, red bollards, and industrial skyline view.

Solution

The solution for this project required all parties to think differently. The hospital had plans to extend upwards in the future, however a temporary roof system would not necessarily provide the best waterproofing coverage. In addition as part of the design, Southampton General wished to include a photovoltaic system that could be used straight away and also be re-used for the roof extension in years to come.

After thoughtful consideration, an inverted roof was selected for high-performance waterproofing, whilst allowing for easy access and maintenance by the facilities management team. The easy access points would in turn be very helpful for maintaining the photovoltaic system in the future.

Garland Approved Contractor, Warner Contracting, was assigned to the project and once the new concrete deck had cured, the Garland bituminous membrane system was installed. Using the StressPly Evolution fully bonded underlay and StressPly Flex cap sheet, the bespoke system included 200mm of XPS thermal insulation to achieve the required 0.15W/m2K thermal performance for a new build construction. Finally, over 100 tonnes of ballast was hoisted onto the 900m​2​ roof, providing a secure platform for the PV system and access walkways.

Warner Contracting also constructed plywood parapet upstands to cover the building’s steel frame, and built to a height that meant a perimeter safety handrail was not required. The plywood upstands would not allow for an open flame, torch-on product, so were encapsulated using Garland’s self-adhesive StressPly Flex SA, conforming to Safe2Torch guidance as outlined by the NFRC.

A roof that has to take another storey later

Inverted roofs are often chosen because the estate expects to build upward, and that decision has to be made before the waterproofing goes down rather than after. Your local Technical Manager will talk through the options for a new build, and a Free Roof Survey covers any existing roofs on the estate.

Commercial, public sector and industrial buildings, and large residential blocks. We do not survey individual domestic properties.

Garland UK
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.