Case Study

Midland Hotel, Iconic Landmark Refurbishment

Midland Hotel, Iconic Landmark Refurbishment

Garland System

StressPly Flex Plus

Sector

Commercial & Offices

This hotel roof refurbishment was delivered at one of the city’s best known buildings. Manchester’s iconic Midland Hotel sits in the heart of the city centre and has been a well-loved retreat for visitors since opening its doors in 1903. Operated by the Jurys Inn Group, the hotel showcases a range of luxury suites, conference rooms, award-winning spas and restaurants. Following decades of service to the city, The Midland Hotel had started to show signs of its age, with multiple areas of water ingress across the site that needed to be addressed to preserve the building for years to come.

Garland UK was appointed to inspect the signs of water ingress, carrying out a site visit by the local Garland Technical Manager, Dan Crowley, to investigate the root cause and custom solution to the issue.

Following the site visit, the comprehensive roof survey found that large portions of the roof system held approximately 20% saturated insulation. Following a further moisture mapping assessment, it was possible to identify the specific saturated areas of the hotel’s roof that had been affected, preventing the need for the entire roof system to be stripped back to the original concrete deck.

Aerial view Midland Hotel rooftop with ornate chimneys and Manchester cityscape

Solution

A collaborative approach was taken between Dan and Approved Contractor Ronald G Graham Roofing, designing works in phases to reduce the disruption to the hotel and ensure budgets were strictly adhered to. With minimal unloading areas available due to the city centre location, all materials were delivered by Garland on the next day delivery as and when they were required, keeping the hotel loading areas clear and operational at every stage.

A bespoke Garland UK specification was designed to upgrade the insulation and U-Value of the hotel to comply with current regulations, remove ponding water on the roof systems with a new tapered insulation design and provide peace of mind to the building owners with a 25-year Garland Single-Point Guarantee.

Ronald G Graham Roofing installed Garland’s StressPly Flex Plus bituminous membrane system, formulated with SBS rubber modifiers for straightforward application, whilst maintaining high tensile and tear strength. Working with extreme care and precision, the contractor carried out the installation to the highest standard, overseen by the Technical Manager, Dan, during twice-weekly site visits.

Guests staying while the roof comes off?

A hotel cannot close for a roof, so the work has to be phased around occupancy, noise restrictions and courtyard access. A Free Roof Survey identifies the defects and the constraints together, and your local Technical Manager sets out a phased programme in writing before anything is booked in.

Commercial, public sector and industrial buildings, and large residential blocks. We do not survey individual domestic properties.

Garland UK
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.