Safety through application
Installing contractors has as much a responsibility as designers in making the construction process as safe as possible. Contractors must perform their own risk assessments before the project starts and continually as work proceeds, as risks that were unknown during the design stage may reveal themselves during the construction process.
Flame-free exclusion zones are created, within which only flame-free roofing products may be used, extending 900mm from any combustible material or high-risk details. Again if there is any doubt at all, a flame-free solution must be used by default. Only if demonstrable that an area is safe can torch-on applications be used.
Guaranteed compliance to all statutory obligations
The Safe2Torch framework, when used with Garland UK’s roofing systems, means that your project is guaranteed to comply with all current regulations, standards and legislation.
Both as members of the NFRC and designated designers under CDM (2015), Garland UK always follows Safe2Torch guidance and codes of practice. As such, we will specify a flame-free system wherever possible to reduce the risk of fire.